Construction Staking, also known as a Site Layout Survey, is the process of interpreting construction plans and marking the location of proposed new structures such as roads or buildings. Construction staking is performed to ensure a project is built according to engineering design plans.
2. which is not true about laying out and staking
Answer:
where is the question
Answer:
Asan po ung Question?O kaya asan po ung pic?
Explanation:
Wla pong Explanation hangga't wlang tanong o kya po walang picture
3. what is the distance between the stakes in laying out building
Answer:
Locate the batter boards 4 feet or more away from the building lines.
Explanation:
not sure if it's correct, hope it helps:)
4. 1. A tool that determines reference point during laying out of foundations.a. Cordb. Level Transitc Stake
Answer:
B
Explanation:
Locating a Bench Mark To lay out a building using a transit or a level, you must first have a basic starting point. This starting point, from which measurements can be made, is usually called the bench mark, or point of reference (POR). A bench mark may be a mark on the foundation of a nearby building.
5. itu is used to drive pegs for stake out
Answer:
if you want the answer you need na maging malinaw ang tanong upang may sumagot nito
6. what is stake out building line ?
Explanation:
my answer
#CARRY ON LEARNING#7. it is used to drive pegs for stake out
Bolo is used to cut pegs for stake-out.
8. it is used to drive or stake out
There in the picture pa brainliest po please
9. First step in staking out building lines.? a. Embed the first taking rod in land. b. prefer toools, materials, and personal protective. c. Embed the second staking rod. d. check and verify all corners of the stake out building lines.
Answer:
b. is the correct answer
Explanation:
because prefer tools is the first step in staking building linesstudy hard everyone10. It is use to drive pegs for stake outpa Answer
Answer:
Bolo is used to cut pegs for stake-out.
Explanation:
A bolo is a large cutting tool of Filipino origin similar to the machete. It is used particularly in the Philippines, the jungles of Indonesia, Malaysia and Brunei, as well as in the sugar fields of Cuba. The primary use for the bolo is clearing vegetation, whether for agriculture or during trail blazing.
11. 7. This is wooden stick or post penetrated to the soil during laying out offoundationsa. Nailb. Stakec.Pole
Answer:
B. Stake
Explanation:
bruh that's ez
12. It is use to drive pegs for stake out
bolo is used to cut pegs for stake out
carry_on_learning
13. the process of locating the position of plants in the field is _______.a. stakingb. laying outc. measuringd. digging
Answer:
the process of locating the position of plants in the field is _______.
a. staking
b. laying out
c. measuring
d. digging
Explanation:
Correct me if im wrong
14. . Locating the position of the tree in the orchard is calledA. Filler B. planting boardC. laying out D. Staking
Answer:
C.
Explanation:
Lay-outing-locating the position of plant in the orchard. Staking-the placing of the pole to mark the position of the plant to be set. Orchard-an establishment where fruit bearing crops are grown.
15. it is used to drive pegs for stake-out
Answer:
Bolo is used to cut pegs for stake-out.
16. bolo is used to cut pegs for stake out
Answer:
True.
.
..
.
.
.
.
.
.
.
.
.
..
.
.
17. what are the considerations in staking out and setting batter board
Answer:
The most important part of batter board construction is ensuring the horizontal members are level with one another, because the layout strings rest on the batter boards. Builders use a transit level to make sure each batter board is at the exact height required. The most common mistake when erecting batter boards is that the cross members are not exactly level with each other.
18. it us used to drive pegs for stake out
Answer:
TALAPINGPING TALAPONGPONG
Explanation:
TALAP TALAP
19. The process of putting stakes or marking in the process of lay outinga.filler b.staking c.planting board
Answer:
The process of putting stakes or marking in the process of lay outing
ANSWER : planting board
20. make a re.search about power lay-out,ligthing lay-out
Answer:
Power Layout:
Power layout is the design of electrical wiring systems in a building, which includes the placement of power outlets, switches, and other components. Power layout is an important component of a building’s electrical system as it ensures that the wiring is done correctly and safely. The layout should be designed with the intent of minimizing risk of electric shock, fire, and other hazards. It should also take into account the aesthetic and ergonomic needs of the building owners and users.
Lighting Layout:
Lighting layout is the design of a building's lighting system, which includes the placement of lights, fixtures, and other components. Lighting layout is an important component of a building’s lighting system as it ensures that the lighting is done correctly and safely while also providing the necessary illumination and atmosphere. The layout should be designed with the intent of maximizing energy efficiency, reducing light pollution, and providing the desired lighting effects. It should also be designed with the aesthetic and ergonomic needs of the building owners and users in mind.
Explanation:
thx me later
21. Which of the following is NOT a standard practice in laying out guest clothes?A. Lay it out on the bed C. Lay it out on the furnitureB. Lay it out on the bathroom D. Lay it where the guest asked
ANSWER
Which of the following is NOT a standard practice in laying out guest clothes?
D. Lay it where the guest asked#KeepLearning
22. why tools Ang materials are in staking out building
Answer:
to know the size or hight
Explanation:
yan lang po
Answer:
WORKPLACE LOCATION.
TOOLS AND EQUIPMENT Hammer Marking Tools Measuring Tools Steel Square Try-square. Hand Saw Chalk Line Water Hose Level Plumb Bob PPE Circular Saw.
TRAINING MATERIALS Leaning Packages Bond paper Ball pens Manuals Related References.
Explanation:
sana po maka tulong
23. what is the distance between the stake in laying out a building
In most cases you want to make sure your batter boards have enough room for you to move your lines while you try to square the building. So, place your stakes at least 4 feet apart from each other and use batter boards that are at least 5 feet long.
24. laying & staking 5. This process is done which includes démolition, clearing, and establishing building measurement on the ground.
Answer:
The process described is typically known as site preparation or site development. It involves various activities such as demolition, clearing, and establishing building measurements on the ground in preparation for construction. Site preparation is an important step in the construction process to ensure that the ground is ready and suitable for the planned building or structure. It may also involve grading, excavation, soil testing, and other activities to prepare the site for construction work to begin
25. What I Have Learned Laying out and staking is an essential part in growing plants especially for fruit bearing trees because
Answer:
by planting fruit trees
26. Tools and Materials used for staking-out building lines
Answer:
pen, pencil, ruler phontograf
27. what is the distance between the stake in laying out a building
Answer:
In most cases you want to make sure your batter boards have enough room for you to move your lines while you try to square the building. So, place your stakes at least 4 feet apart from each other and use batter boards that are at least 5 feet long
28. set out stakes from pre-determined?
Answer:
They are more or less temporary devices that support the stretched cords that mark the outline and grade of the structure. Figure 14-40. -Batter boards. stakes are driven about 3 to 4 ft away from the building line where they will not be disturbed by the construction.
Explanation:
Leave a heart and Sana ma appreciate nyo Po
29. It is used to drive pegs for stake-out
Explanation:
Bolo is used to cut pegs for stake-out.
30. It provides a level and uniformly distribute support for the structureA. BackfillingB. ExcavationC. FoundationD. Laying out and Staking